spot_img
Friday, November 22, 2024
Partnered withspot_img

New energy facilities in Nikšić

Supported byOwner's Engineer banner

The Podgorica company Somsol plans to build a solar power plant in the Somina settlement in Nikšić, with a maximum power of 240 MW.
As it was announced, the Government issued the investor with urban technical requirements for the preparation of technical documentation.
-According to previous analyzes conducted by the investor, it was determined that 240 MW is the maximum possible capacity of the future solar power plant. In accordance with the Law, all the necessary opinions of the competent authorities were previously obtained – it was stated in the discussion.

Sign up for business news updates & special reports.

Supported byElevatePR Digital

Related posts

error: Content is protected !!