spot_img
Monday, December 23, 2024
Partnered withspot_img

Rudine energy park company plans to build a solar power plant in Nikšić with a capacity of 186 MWp

Supported byOwner's Engineer banner

The government has issued urban planning and technical requirements for the preparation of technical documentation for the construction of a facility for the production of electricity from renewable resources – a solar power plant, at the request of the company Rudine energy park from Podgorica.

The site for the construction of the power plant is located in the scope of KO Rudine in the Municipality of Nikšić. The site in question has the potential to build a photovoltaic power plant with a peak power of 186.1 MWp, and the total area is about 131 ha.

Supported by

Sign up for business news updates & special reports.

Supported byElevatePR Digital

Related posts

error: Content is protected !!